Ovenden Allworks surfacing division undertook the new kilometer of footpaths around the Gibraltar Barracks in Minley, Surrey. These works included the shaping of the sub-base, laying of the kerbs and the laying of the blacktop. Also, the construction of new 4 bellmouths and a set of steps to increase accessibility in the barracks. These works were completed while working along highways in constant use, therefore traffic management was a priority.
These works required the close cooperation between ourselves and the main contractor, Limen Construction as there are strict rules to be adhered to when working inside a Ministry of Defence base.
FOOTPATHS, GIBRALTAR BARRACKS
Client: Limen Construction