Minley Footpath Construction
Steps at Gibraltar Barracks

Ovenden Allworks surfacing division undertook the new kilometer of footpaths around the Gibraltar Barracks in Minley, Surrey. These works included the shaping of the sub-base, laying of the kerbs and the laying of the blacktop. Also, the construction of new 4 bellmouths and a set of steps to increase accessibility in the barracks. These works were completed while working along highways in constant use, therefore traffic management was a priority.

These works required the close cooperation between ourselves and the main contractor, Limen Construction as there are strict rules to be adhered to when working inside a Ministry of Defence base.

Curbs and sub-base construction
Footpath Gibraltar Barracks

FOOTPATHS, GIBRALTAR BARRACKS

Client: Limen Construction