TOP GEAR TRACK, SURREY

Leachate treatment plant, Ovenden Allworks, Case study
Ovenden Allworks powerfloating case study
Ovenden Allworks Banstead Leisure Centre, Case Study

​PASSIVHAUS GROUNDWORKS, KENT

Varne Boat Ramp Case Study

Ovenden Allworks can undertake a full range of civil engineering and ground works, from concrete works, surface or foul drainage, kerbing and surfacing to trenching and flood defences.


We have completed a wide array of projects in various sectors, from renewable energy, waste management and recreational leisure with many different challenges including local councils, Viridor Waste Management and the BBC.


Take a look at case studies of projects Ovenden Allworks have completed below.

Ovenden Allworks Solar Farms case study
Canterbury Causeway anti flood, Ovenden Allworks, Case study
William Harvey Carpark, Ovenden Allworks, Case study
Seasalter Boat Ramp, Ovenden Allworks, Case study

WASTE TRANSFER SLAB, BEDDINGTON

IDB Internal Drainage Board. Tilting Weir

TILTING WEIR,

​HACKLINGE

BANSTEAD LEISURE CENTRE, SURREY

BOAT RAMP,

SEASALTER

Ovenden Allworks Solar Farms case study
Rampisham BBC World Service. Tower Demolition

WAREHOUSE FOUNDATIONS, THANET

RIVER WALL,

LITTLEBOURNE

NEW CAR PARKS, ASHFORD

​​SOLAR FARM GROUNDWORKS

BBC WORLD SERVICE DEMOLITION, DORSET

Rampisham BBC World Service. Tower Demolition

VARNE BOAT RAMP,

KENT

NEW RECYCLING

YARD,​HERSDEN

Flood defences Strood, Canal Road, Ovenden Allworks, Case study

CONCRETE REPAIR TO CLIFF FACING, KENT

CAUSEWAY FLOOD DEFENCE, CANTERBURY

Lings recycling Yard, Ovenden Allworks, Case study

TYLER COURT STEPS, KENT UNI

FLOOD DEFENCES, STROOD

CONCRETE RETAINING BUND, KENT

Rampisham BBC World Service. Tower Demolition
Ovenden Allworks Logo

​​​​​​CIVILS AND GROUNDWORKS

Littlebourne River wall, Ovenden Allworks, Case study
Kent University Steps, Ovenden Allworks, Case study

 Contact us:      01304 843030

Beddington Landfill Concrete, Ovenden Allworks, Case study