Ovenden Allworks Logo

 Contact us:      01304 843030

External works Banstead leisure centre Ovenden Allworks
Banstead Ovenden Allworks construction

Ovenden Allworks successfully won the contract for the groundwork package for the new Tadworth Leisure and Community Centre. These works included everything from the initial enabling works, reinforced pile caps, foul water drainage and pumping station, surface water drainage with associated attenuation and deep well soak-away units, the 2000m2 reinforced concrete floor slabs.

Ovendens later returned to complete the external works. Including kerbing, footpaths and car parking areas, using our expert in-house surfacing team.

This project required close cooperation with the main contractor and other sub contractors due to the high volume of works by various trades being completed in a restricted area on a fast track programme.

Councillor Ros Mill said: "The centre looks amazing and provides fantastic facilities to help people of all ages and abilities keep healthy and active”.

"We've had a lot of positive feedback already from residents and sports clubs who are keen to be able to get in and use it."

Banstead leisure centre construction

TADWORTH LEISURE CENTRE, SURREY.

Client: Pellikaan

Concrete works at Banstead leisure centre
External Furnishings