Ovenden Allworks Logo

 Contact us:      01304 843030

LOADING DOCK- ASDA HOLLINGBURY

Client: HB Projects

Ovenden Allworks were appointed by HB Projects to undertake the groundworks for the new ramp and loading dock at the ASDA superstore in Hollingbury.


These works included the saw cutting and breaking out of the existing concrete, excavation and removal of arisings from site to install the new 30m reinforced concrete ramp with dock leveller.


Ovenden Allworks also constructed the the foundations and floor slab for the new superstore extension to create a new loading dock.


The project also included the rerouting of the surface water drainage and reinstation of surfacing around the new ramp structure, including pumping stations and ACO drains.


The project was completed on time and within budget, despite the tight programme and compact linear site.